TTM Configuration Overview | Timesheet Entry Configuration Overview |
---|
Before you start to use Time Tracking and Management (TTM) you will need to identify the data-source for the tasks that will be displayed in the Timesheet Entry Web Part.
This is a mandatory configuration step in the Time Tracking configuration checklist, and the TTM configuration decision map is available to help identify which data-source option you should use.
There are two task data-source options available:
- Bamboo List Rollup
- You can use a custom created rollup
- or, you can reference an existing PM Central tasks rollup
- SharePoint list (default)
When configuring the Timesheet Entry Web Part to use a Bamboo List Rollup as the task data-source keep in mind:
- Using a Bamboo List Rollup Schema lets you display tasks from multiple SharePoint tasks lists.
-
If you are using a custom rollup, you will need to create the schema before configuring the Timesheet Entry Web Part.
-
Additional information on using TTM with PM Central is available here
To configure Timesheet Entry to display data from a Bamboo List Rollup:
NOTE: The following steps require you to have accessed the Timesheet Entry Configuration Settings screens by clicking the Timesheet Entry Web Part Settings button in the Web Part’s configuration tool pane.
Action | Result | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1. | From the Timesheet Entry configuration screen, click the Bamboo List Rollup button under Data Source Settings in the navigation tool pane. NOTE:You will only be able to select this button if Bamboo List Rollup is selected as the Data Source Type |
The Bamboo List Rollup screen will be displayed on the right side of the configuration pop-up and allow you to scroll through the configuration options associated with the data-source. | ||||||||||||||||||
2. |
Enter the site where the Bamboo List Rollup Schema is located.
Both absolute paths (http:// server name/site ) or relative paths(./Site/) can be used for the site URL. IMPORTANT: If connecting to PM Central, the site must be in the same site collection as TTM for application integration to be supported. |
|||||||||||||||||||
3. | Click the green arrow to load available List Rollup Schemas in the site, then pick the desired schema list from the Select Schema drop down. |
|||||||||||||||||||
4. |
|
|||||||||||||||||||
5. |
You have now configured the Web Part to use a Bamboo List Rollup as the tasks data-source. Click these links for additional Web Part configuration topics:
|
|||||||||||||||||||